bulk cement concrete placement 散水混凝土浇筑
The chemical wash is pumped ahead of the cement slurry to help ensure effective mud removal and efficient cement placement.
化学冲洗剂在水泥浆之前泵入,以利于确保有效地去除泥浆和有效地放置水泥浆。
A float collar is placed at the top of the float joint and a float shoe placed at the bottom to prevent reverse flow of cement back into the casing after placement.
浮箍是放置于浮动接头之上的,而浮鞋则是放置于浮动接头之下,以防止水泥浆回流到套管内。
But, concrete placement temperature, surrounding temperature and the heat of hydration of cement, they take a more affection on lining thermal stress.
混凝土的浇筑温度、环境温度以及水泥水化热对温度应力的影响十分显著。
应用推荐